Vintage

Something Different for Joomla

CHWI News Delivered to You!

Free Building Tips

Sign up for our FREE monthly newsletter and receive...

  • Open house dates
  • Seminar announcements
  • Cost saving design ideas
  • Tips on buying property
  • Sample floor plans & pricing

Your email address and contact information will be kept private.
 

Satisfied Clients

"An Extremely Positive Experience"

We have had the pleasure of knowing Mike and Judy Flanagan since 2001. We met at an Open House for their business, Cedar Homes of Washington. We were looking at cabin packages to build a retreat in the mountains for our family. Their openness, friendliness and willingness to help is genuine. We never felt any pressure to give a commitment. The fact that the home they live in is a product they built themselves from a kit is a positive statement that they know the design and build process - have been through it - and know first hand about long term maintenance, etc. for these type of structures.

The summer of 2004, we had a contractor build the shell of our cabin and it was an extremely positive experience. There have been minor issues that have come up during the building process, such as shortages for hardware. Mike and Judy have always promptly returned phone calls and remedied the situation in short order. We cannot think of a way that they could improve the way they conduct their business or improve their customer service.

-- Jim and Susannah Lake

 
Under Construction
Poulsbo Home Addition Print E-mail
Cedar home foundation 
Perimeter foundation installed and ready for the floor system. 
 Cedar home addition
Halfway through the first day of installing laminated timber wall system.
 Cedar home addition
Timber walls are up and the roof system is underway.
 Cedar home addition
At the end of two weeks, the roof system is done, windows and doors installed -- and Sikkens stain applied.
   
   

 

These homeowners are project managing an 850 sf addition to their existing home.  The addition is built with our laminated cedar timber wall system.

The added space will include a new kitchen and rec room.

The timber walls were up in about one day.

The homeowners sided over the dormer on their existing home -- to match the timber walls on the addition. 

Plans call for new roofing for both the existing home and addition.

The total time elapsed from the installation of the floor system to the roof system was about 10 days.

 
Cutter 1665 in Black Diamond, WA Print E-mail
Cutter 1665 cedar home
Foundation includes space for a two-car garage and utility room.
 Cedar home Cutter 1665 under construction
Laminated cedar columns are in place and ready for timbers.
 Cedar home Cutter 1665 under construction
Main level laminated timber walls in place.
 Cedar Home
Moving on to finish work on the inside!
   
   

After a damp spring, the weather has improved and construction is well underway on this 3 bedroom prow-front Cutter design.

The homeowner has chosen our 5 x 8 laminated cedar timber wall system.

The slope is the perfect setting for a two-car garage and utility room underneath the main living area.  The main floor includes two bedrooms, laundry, bath and an open kitchen / great room concept.  The loft level includes a spacious master bedroom suite with a full bath and walk-in closet.

 

 
Gorst, WA Lifestyles 4,504 sf Print E-mail
Sandridge Cedar Home
The 9 ft.basement foundation walls installed. Backfill completed.
Sandridge cedar home
Main floor and roof system framing completed.
 Post and beam cedar home
Covered porch and hand hewn log posts installed.
 Post and beam cedar home
The homeowners (and project managers) are installing the D-log cedar siding.
   
   

Construction is well underway on a Lifestyles 4,504 sf with a full basement.  This home is perched on a hillside with a forest and territorial view.

The homeowners chose our Post & Beam wall system (stud framing with cedar D-log siding at the exterior walls).  Plans call for a full covered porch with log post accents.

The main floor includes a spacious kitchen / dining / great room along with a master suite with a walk-in closet and a separate tub and shower - and two additional bedrooms.  A laundry room and second bath are also on the main level. There is an attached two-garage at the rear of the home. The basement layout includes a bedroom, full bath, library, shop, fitness room, mechanical room and a large storage area.


The homeowners have built extensive rock retaining walls -- all from rocks found on their jobsite.

Watch this space for more construction progress photos!

 
Cle Elum (Bell Creek) Home Print E-mail
Cedar home under construction
Shell construction completed. Interior finish work will resume in the Spring.
 Post & Beam construction
Interior finish work continues. Deck railings are next. 
   
   
   
   

 

Shell construction of this Cutter 1750 was completed before the snow fell.  The homeowner (who is project managing the construction of the home) will resume the finish work when weather permits.

Kittitas County fire codes required the home be designed with metal roofing, cement board siding and fire resistant decking.  We are able to meet this requirement using our post & beam (stud framed) wall system.

The 1,100 sf main floor includes an open great room, kitchen, bath and two bedrooms. The 650 sf loft level includes a master bedroom suite with a walk-in-closet and a library.  The basement level (1,100 sf) includes a one-car garage, family room, laundry room and bathroom.

 

 
<< Start < Prev 1 2 3 4 Next > End >>