Preparation
For Building:
A Pre-Construction Timeline
Note: This timeline
represents only a suggested path. Each homeowner may approach
their project differently and have special building or land
development considerations. Cedar Homes of Washington will assist
the homeowner to organize their own building project and
timeline.
- Development of preliminary
blueprints
- Pre-qualify for financing
& bank selection
- Water - (hook ups or well
drilling)
- Septic - (drainfield design apprvd. by
Health Dept.)
- Check for:
- Building covenants
- Wetlands
- Easements
- Setbacks
- Critical Area designation
- Road or school
mitigation fees (paid in addition to permit fee)
- Determine construction
method (owner/bldr., project mgr. or contractor)
- Blueprint revisions
- Stake out home at jobsite
- Review slope for basement
- Preliminary plans to
subcontractors for bids
- Final plans complete with Engineer stamp
(if required)
- Submit forms required by
bank for financing approval
- Develop plot plan
- Submit plans &
paperwork to county for permit
- Approval of permit
- Approval of financing with
letter of commitment from lender
- Sign final blueprints &
give cutting approval
- Excavation of site
- Foundation & plumbing
(basement)
- Temporary power pole at
jobsite
- Forklift or boom truck
arrives at site
- Home package arrives at
site
- Inventory by Cedar Homes of
Washington
"For all the help
you've given me, the advice, the help with the inventory and unloading and the
encouragement, a heartfelt thank you! Please feel free to share my experience
with any others who may be a little nervous about undertaking a project like
this. I'd be more than pleased to talk to them." - Lee
Smith Westport, Washington