Materials List

Complete Shell Package - Standard Materials Included

Item

Description

Exterior Walls

5 x 8 Cedar laminated timbers

Option for 6 x 8 Cedar D-Log or Post & Beam

Interior Walls

2 x 4 S/B stud framing, 2 x 6 stud framing at plumbing walls, cover by owner

Option for solid laminated timber interior walls

Floor System

Mud sills, girders, 2 x 10 floor joists 16” o.c., blocking and ¾” t & g plywood

Option for Truss Joist I-Beams (TJI)

Midfloor / Loft

2 x 8 floor system, blocking and ¾” plywood.

Option for glue lam beams w/ 2 x 6 t & g whitewood decking, ½” particle board underlayment

Roof System

2 x 10 raftered roof system, glue lam beams, ½” plywood sheathing.

Option for glue lam open beam ceilings, purlin wedges & 2 x 6 decking, ½” plywood sheathing

Option for scissor trusses or standard trusses

Roofing Mat’l

Not included in national price list, but is normally provided once your preference is known.

Option for: shake, composition, metal, tile, etc.

Windows

Vinyl framed windows and sliding glass doors, screens and hardware, window liner

Option to wood windows, clad or fiberglass windows
Option for skylights
Option for Low E coating and argon gas

Doors

Exterior raised panel DF doors pre-hung & weather-stripped
Interior doors and closet bifolds solid core flush oak or birch

Option to upgrade to metal exterior doors, special order doors

Loft Railings & Ballusters

2 x 6 railing with 2 x 2 ballusters
Option for a wide selection of architectural railings & ballusters

Hardware

Bolts, nuts, adhesives, caulkings, structural fasteners, flashings

Interior Sairs

Open riser system, glue lam stringers, glue lam treads, 2 x 2 clear hem balusters and 2 x 6 clear hem railings

Trim

Rough sawn fascia & bargeboard, cedar window liner, cedar window & door casings, beam & ceiling trim, 1 x 8 base skirting at rim joists

Basement, deck and garage packages priced separately.

Items not included in Cedar Homes of Washington home packages are:

Transportation, engineering fees, building permit fees, nails, cabinets, floor coverings, sheetrock, stain / paint, foundation or masonry work, exterior stairs to grade, plumbing, heating, electrical, fireplace(s), construction labor, excavation and site preparation.

Free price estimates available on your design – or modifications to one of our stock designs. Choose from options listed above for timber wall system, subfloor, windows, doors and roofing. Fax or mail your design with selected options to:

Cedar Homes of Washington, Inc.
13110 NE 177th Place #205
Woodinville, WA  98072

 

Phone: 360 / 668-8242

cedarhomes@chwi.com

What Our Clients Are Saying...

"The Best Place Possible"

It is our hope that this letter will ease your mind that you have found the best place possible to start the exciting journey of building your cedar home.

While driving in North Bend, WA in the summer of 2004, we passed a charming small log home. The owner of this home noticed our interest and invited us to see her home. She was quite proud of it and was used to the attention it received from passersby. She gave us the name and number for Mike and Judy Flanagan (Cedar Homes of Washington).

After meeting with Mike and Judy at their beautiful home, our expectations that they were indeed honest, decent people to work with- were met. We are now nearing completion of our home, and in reality, Mike and Judy's job with us is done. They could move on with other projects. Yet, they still check in with us and will continue to do so until we are complete.

In the course of building our home, we found two big advantages in choosing Cedar Homes of Washington. First, when filing the permit, Mike was there. Mike stayed with us the whole day, answering questions from the building department, enabling us to get our plans submitted in one day. The process would've taken days (and many trips) to and from to finalize this step of the process (if we did this one our own). The second advantage was, if you were to buy a package directly from Pan Abode, or perhaps another dealer, your home package would be literally dropped at your site for you to handle. Mike and Judy were right there at the drop-off, overseeing the placement of all materials, taking inventory of all materials and making sure any discrepancies were rectified.

-- Bob and Laurie Jensen